Rki-instruments Beacon 200 Rig Monitor, LEL/H2S User Manual

Browse online or download User Manual for Sensors Rki-instruments Beacon 200 Rig Monitor, LEL/H2S. RKI Instruments Beacon 200 Rig Monitor, LEL/H2S User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 54
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
www.rkiinstruments.com
Combustible Gas and
Hydrogen Sulfide
Beacon 200 Rig Monitor
Operators Manual
Part Number: 71-0243RK
Revision: B
Released: 9/30/14
Page view 0
1 2 3 4 5 6 ... 53 54

Summary of Contents

Page 1 - Operator’s Manual

www.rkiinstruments.comCombustible Gas andHydrogen SulfideBeacon 200 Rig MonitorOperator’s ManualPart Number: 71-0243RKRevision: BReleased: 9/30/14

Page 2

5 • Beacon 200 Rig Monitor Operator’s ManualExternal DescriptionThis section describes the housing and all external components of the Beacon 200 Rig

Page 3 - Product Warranty

Beacon 200 Rig Monitor Operator’s Manual • 6LEL Detector Junction Box and CableThe LEL detector consists of a junction box with a mounting bracket, t

Page 4 - Table of Contents

7 • Beacon 200 Rig Monitor Operator’s Manualto the interior of the junction box.The combustible gas detector is a catalytic type detector that produc

Page 5

Beacon 200 Rig Monitor Operator’s Manual • 8The H2S detector is factory wired through the middle cable bushing of the Beacon 200 and has a 25 foot ca

Page 6 - Chapter 1: Introduction

9 • Beacon 200 Rig Monitor Operator’s Manual12 VDC Battery CableA 50 foot cable with clamps for connection to a 12 VDC battery (customer supplied bat

Page 7 - ~ Vac (AC voltage)

Beacon 200 Rig Monitor Operator’s Manual • 10Status LightsThe Rig Monitor includes four status lights that indicate the current status of the monitor

Page 8 - Specifications

11 • Beacon 200 Rig Monitor Operator’s ManualMain PCBThe main PCB is mounted inside the housing. The power supply mounting plate is mounted to the ma

Page 9 - Chapter 2: Description

Beacon 200 Rig Monitor Operator’s Manual • 12• DC In Terminal Strip. The DC in terminal strip is a 3-point terminal strip located above the controlle

Page 10 - External Description

13 • Beacon 200 Rig Monitor Operator’s ManualNOTE: The alarm 2 channel relays may be set to operate as individual channel fail relays. See “Configure

Page 11

Beacon 200 Rig Monitor Operator’s Manual • 14Chapter 3: Installation and Start UpOverviewThis chapter describes procedures to mount the Beacon 200 Ri

Page 12

Beacon 200 Rig Monitor Operator’s ManualWARNINGRead and understand this instruction manual before operating instrument. Improper use of the rig monit

Page 13

15 • Beacon 200 Rig Monitor Operator’s Manual 1. Select the mounting site. When you select the mounting site consider the following factors:• Can the

Page 14 - Internal Description

Beacon 200 Rig Monitor Operator’s Manual • 16 2. Close and latch the housing door. 3. Position the monitor on a vertical surface at eye level (4 1/2

Page 15 - Program Buttons

17 • Beacon 200 Rig Monitor Operator’s ManualWiring the Beacon 200 Rig MonitorThe detector leads, junction box connections, power cable wiring, and s

Page 16 - Main PCB

Beacon 200 Rig Monitor Operator’s Manual • 18WARNING: Make all connections to the Beacon 200 Rig Monitor before you connect the DC power source. Befo

Page 17 - Terminal Connects to:

19 • Beacon 200 Rig Monitor Operator’s Manual 4. Guide the wiring of the external alarm device through the new conduit hub on the bottom of the Rig M

Page 18 - Power Converter

Beacon 200 Rig Monitor Operator’s Manual • 20 5. Connect the wires form the recording device to the recorder output terminals as shown in Figure 11.S

Page 19 - Mounting the Beacon 200 Rig

21 • Beacon 200 Rig Monitor Operator’s ManualChapter 4: OperationOverviewThis chapter describes the Beacon 200 Rig Monitor in normal operation. This

Page 20 - BEACON 2 00

Beacon 200 Rig Monitor Operator’s Manual • 22Recorder Output OperationThe output at the recorder output terminals is a 4 - 20 mA signal for each acti

Page 21

23 • Beacon 200 Rig Monitor Operator’s ManualAlarm IndicationsThis section describes the Rig Monitor in alarm 1, alarm 2, and fail conditions and sug

Page 22 - Wiring the Beacon 200 Rig

Beacon 200 Rig Monitor Operator’s Manual • 24NOTE: You can select normally energized (NE) or normally de-energized (NDE) channel relay settings in th

Page 23 - Connecting External Alarms

Beacon 200 Rig Monitor Operator’s ManualProduct WarrantyRKI Instruments, Inc. warrants gas alarm equipment sold by us to be free from defects in mate

Page 24 - Connecting a Recorder

25 • Beacon 200 Rig Monitor Operator’s ManualAlarm 2 ConditionThis section describes the audible and visual indications for an alarm 2 condition and

Page 25

Beacon 200 Rig Monitor Operator’s Manual • 26• The display reading is -10% of full scale or lower.• The Rig Monitor or detector head is malfunctionin

Page 26 - Chapter 4: Operation

27 • Beacon 200 Rig Monitor Operator’s ManualViewing & Resetting Min/Max ReadingsThe Reset switch may be used to view and reset the minimum and m

Page 27 - Recorder Output Operation

Beacon 200 Rig Monitor Operator’s Manual • 28Chapter 5: Channel Control and Setup ProgramOverviewThe Channel Control & Setup Program allows viewi

Page 28 - Alarm Indications

29 • Beacon 200 Rig Monitor Operator’s ManualEnable/Disable Channel(s) Menu 1. From normal operation, simultaneously press and hold the ESCAPE and EN

Page 29 - Alarm 1 Condition

Beacon 200 Rig Monitor Operator’s Manual • 30Configure Channel Settings MenuThis section describes how to view and change channel parameters for the

Page 30 - Fail Condition

31 • Beacon 200 Rig Monitor Operator’s Manual 10.Press the UP/YES button to save the configuration. The screen will then return to the Channel Contro

Page 31 - Low Battery Condition

Beacon 200 Rig Monitor Operator’s Manual • 32View System Information MenuThe View System Information Menu consists of only one display screen which i

Page 32 - Readings

33 • Beacon 200 Rig Monitor Operator’s ManualChapter 6: MaintenanceOverviewThis chapter describes use of the Calibration Program and corrective maint

Page 33

Beacon 200 Rig Monitor Operator’s Manual • 34NOTE: The following procedure assumes that the target gas is present in a high enough concentration to a

Page 34 - Setting Description

Beacon 200 Rig Monitor Operator’s ManualTable of ContentsChapter 1: Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 35 - Configure Channel Settings

35 • Beacon 200 Rig Monitor Operator’s ManualNOTE: While in the Calibration Program, the alarm status of the Beacon 200 Rig Monitor will be locked in

Page 36

Beacon 200 Rig Monitor Operator’s Manual • 36 4. Screw the fixed flow regulator into the zero air calibration cylinder. 5. Use the calibration kit sa

Page 37 - View System Information Menu

37 • Beacon 200 Rig Monitor Operator’s ManualIf you press the DOWN/NO button, the span of channel 1 will continue if you selected it or if you did no

Page 38 - Chapter 6: Maintenance

Beacon 200 Rig Monitor Operator’s Manual • 38NOTE: Be sure that you are using an appropriate calibration cylinder for the channel you are calibrating

Page 39 - Preparing for Calibration

39 • Beacon 200 Rig Monitor Operator’s ManualAdjusting Strobe/Horn VolumeThe horn volume on the strobe/horn can be adjusted by doing the following: 1

Page 40

Beacon 200 Rig Monitor Operator’s Manual • 40 5. Turn the cover over and locate the Audio Select switch at the top of the cover as shown in the figur

Page 41 - Adjusting the Span Setting

41 • Beacon 200 Rig Monitor Operator’s ManualReplacing Components of the Rig MonitorThis section describes how to replace the fuses, the LEL detector

Page 42

Beacon 200 Rig Monitor Operator’s Manual • 42 4. Disconnect the detector leads from the terminal block in the junction box. Note the position of the

Page 43

43 • Beacon 200 Rig Monitor Operator’s Manualcap back onto the housing body. 10.Screw the calibration cup/splash guard back onto the detector housing

Page 44 - Adjusting Strobe/Horn Volume

Beacon 200 Rig Monitor Operator’s Manual • 44 12.Place the Rig Monitor’s power switch in the ON position, then verify that the PILOT light is on.CAUT

Page 45 - (DO NOT ADJUST)

Beacon 200 Rig Monitor Operator’s ManualChapter 6: Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 46 - Rig Monitor

45 • Beacon 200 Rig Monitor Operator’s ManualNOTE: Ensure that you are using an appropriate calibration cylinder for the channel you are testing. 5.

Page 47 - S Sensor

Beacon 200 Rig Monitor Operator’s Manual • 46QuarterlyCalibrate the LEL and H2S detectors as described in the Calibration section of this manual.Trou

Page 48 - S Detector

47 • Beacon 200 Rig Monitor Operator’s ManualBuzzer Not Working• The buzzer does not sound an audible alarm during alarm conditions.• The buzzer soun

Page 49 - Preventive Maintenance

Beacon 200 Rig Monitor Operator’s Manual • 48Parts ListTable 10 lists the part numbers and descriptions for replacement parts and accessories offered

Page 50

49 • Beacon 200 Rig Monitor Operator’s ManualES-1537-H2S H2S replacement sensorTable 10: Parts List, Beacon 200 Rig MonitorPart No. Description

Page 51 - Troubleshooting

1 • Beacon 200 Rig Monitor Operator’s ManualChapter 1: IntroductionOverviewThis chapter briefly describes the Beacon 200 Rig Monitor. This chapter al

Page 52

Beacon 200 Rig Monitor Operator’s Manual • 2About this ManualThe Beacon 200 Gas Monitor Operator’s Manual uses the following conventions for notes, c

Page 53 - Parts List

3 • Beacon 200 Rig Monitor Operator’s ManualSpecificationsTable 1 lists specifications for the Beacon 200 Rig Monitor. WARNING: When using the Beacon

Page 54 - Part No. Description

Beacon 200 Rig Monitor Operator’s Manual • 4Chapter 2: DescriptionOverviewThis chapter describes external and internal components of the Beacon 200 R

Comments to this Manuals

No comments